Flow distance reduction for a multi-product flowline with sets of identical machines

Flow distance reduction for a multi-product flowline with sets of identical machines http://repository.uhamka.ac.id/1628/ A group of M machines for processing a set of jobs in a manufacturing system is often located in a serial line. An efficient strategy for locating these machines is desired such that the total travel distance or the cost of transporting… Continue reading Flow distance reduction for a multi-product flowline with sets of identical machines

Finite horizon planning with fixed-interval deliveries and no shortage

Finite horizon planning with fixed-interval deliveries and no shortage http://repository.uhamka.ac.id/1629/ The ordering policy of raw materials and the manufacturing batch size for frequent deliveries of finished goods over a finite horizon play a significant role in managing the supply chain logistics economically. This research develops an ordering policy for raw materials and determines an economic… Continue reading Finite horizon planning with fixed-interval deliveries and no shortage